Licensed Asbestos Removal Project: Salisbury Pipe Lagging

New 3 year license awarded by the HSE
November 5, 2026
Asbestos Artex Removal: Lymington Yacht Club
November 5, 2026
Show all

We’re currently working inside a full asbestos enclosure on a large, complex licensed removal project in Salisbury, carefully removing asbestos pipe lagging under controlled conditions.

The photographs show the sealed containment corridor — blue polythene walls, taped seals at floor level, and a continuous enclosure designed to isolate the work area and protect the rest of the building. Work is being carried out using industry-approved methods, negative pressure, and thorough air monitoring so that every stage stays fully compliant with HSE requirements.

Projects like this demand careful planning, robust enclosure construction, and close coordination on site. As always, health, safety and compliance sit at the centre of the job — from plan of work and enclosure set-up through to removal and final clearance.

Keep an eye on this space for more updates as the Salisbury pipe-lagging works progress.